# Self-consumption and small installations

_The installation goes up in days and the documentation stays with the building for twenty years._

**Responde a:** self-consumption installation documentation · solar panel legalisation paperwork · photovoltaic installation certificate · what to keep from a solar installation

A self-consumption installation is a short project with long consequences: it goes up in a few days, and the documentation it generates is needed every time the building is sold, a warranty is claimed, maintenance is contracted or the supply account holder changes.

## What remains once the installer leaves

| Document | What it is for later | Who holds it if you do not ask |
| --- | --- | --- |
| Installation certificate | Evidences it was done and with what specification | The installer, and only them |
| Registration paperwork | Justifies the installation to whoever asks | Split between installer and agent |
| Equipment datasheets and warranties | Claiming when something fails under warranty | The installer, or the manufacturer |
| Photos of the installation work | Seeing what lies behind what is no longer visible | Nobody, unless someone took them |

> [!IMPORTANT]
> The fourth row looks dispensable and is the most appreciated five years on. Once installed, much of the system stops being accessible: conduits, fixings, whatever sits behind a panel. **Half a dozen photos taken during the work are worth more than twice as many pages of technical specification** when something must be repaired or extended.

## What to require before paying the final invoice

1. **The certificate and registration paperwork, complete** — It is the only lever: once paid, the installer's priorities move on.
2. **Warranties with their start date** — Usually commissioning, not equipment purchase.
3. **The as-installed layout and the photos** — Ask explicitly: hardly any installer hands them over unprompted.
4. **And who maintains it and how often** — Even if you decide not to contract it: knowing what should be checked is already useful.

> [!WARNING]
> The detail that surfaces on sale or letting: **the installation is part of the building and its documentation transfers with it**. A buyer or their bank may ask for it, and not having it can complicate or delay the transaction for a reason nobody associates with panels fitted six years ago. It is the building-manual argument applied to something installed afterwards.

## During the installation's life

**En corto**

- Every inspection or intervention, into the same file.
- Incidents with dates, which is what supports a warranty claim.
- And any change of supply account holder.

> [!NOTE]
> Which procedures, certificates and notifications each installation requires depend on capacity, type and region, and they get updated. **Your installer or engineer confirms that**; this describes which documentation is worth gathering and keeping whatever procedure applies to you.

**What if the previous owner installed it?**

Ask for whatever exists at purchase: reconstructing it later is expensive and sometimes impossible.

**Does the invoice count as evidence?**

As expenditure yes; as evidence of the installation, no.

**Is this needed for a small installation?**

The volume of paper is smaller, but the problem at sale is identical.

## Ejemplos

**A company sells a warehouse and the buyer asks for the solar documentation.**

- On the next installation, requires certificate, registration and photos before the final payment

→ The documentation travels with the building and the deal is not held up by a years-old paper.

**A solar installer delivers thirty systems a year and each legalisation file is built from scratch.**

- Saves the complete process as a template
- Requests what depends on the customer on day one
- Checks what is missing per installation before filing

→ The thirty-first installation is processed in a fraction of the time the first took.

**A customer document is missing and the filing stalls.**

- Requests what depends on them when the contract is signed

→ The wait runs in parallel with the works.

**The customer asks for the documentation years later for a grant.**

- Keeps the complete file with its date

→ The request is met without reconstructing.

**A component is replaced and the documentation stays the same.**

- Updates the file with every change

→ The paper describes what is installed.

**Installation photos stay on a phone.**

- Uploads them to the file at the moment

→ The evidence outlives the handset.

**Later maintenance does not know what was installed.**

- Stores the file with the installation

→ Whoever maintains it finds what went in.

**Each technician documents differently.**

- Uses the same template for everyone

→ The files are comparable.