Waste: traceability and transfers

Who took it, where it went, and how to prove it three years later.

Updated on 13/08/2026

Waste works like subcontractors: responsibility does not end when the lorry leaves your gate. If the manager was not authorised or the waste ended up where it should not, the question comes back to you — and it arrives years later.

The three blocks you must be able to show

BlockWhat it coversModule that helps
The manager is authorisedAuthorisation valid on the transfer dateTrackline, with expiry marked
Every transfer is on recordIdentification and acceptance documentsTrackline, one case per transfer
Nothing was altered afterwardsThe register, with a trusted dateSmartCheck over the periodic register

Important

The manager's authorisation must be valid **on the transfer date**, not today. That is the classic trap: it gets checked once at contracting and never again, and three years later it turns out it lapsed in between. Marking it with an expiry is what prevents it.

Frameworks cited

Waste and contaminated land regulation, the chronological register, waste transfer identification documents and — for hazardous waste — specific transport requirements. Exactly which documentation applies to you depends on the waste type, your activity and your region; confirm with your adviser.

Watch out

If you produce hazardous waste, the carrier also comes into play alongside the manager, with their own documentation and their own expiry. That is two cases, not one.

Worth knowing

Certifying the chronological register annually, with its date, turns a record you could have edited into something an inspector cannot argue with.

How long must it be kept?

Periods depend on the waste type and applicable rules; check.

What if the manager's authorisation changes mid-year?

Upload it as a new version; the previous one stays, and it is the one that was valid before.

Does it serve for an environmental inspection?

It is the cross-check they ask for: an authorised manager on that date and a documented transfer.

A real case

The situation

A manufacturer discovers at an inspection that its waste manager's authorisation lapsed for four months.

What you do

  1. Marks the authorisation with an expiry and a 60-day warning
  2. One case per transfer, with its documentation

What you get

The history pins down exactly which transfers fell in that window, instead of leaving the whole year in doubt.

The situation

Collection receipts pile up in a folder by date.

What you do

  1. Organises them by contractor and waste type

What you get

You search the way people ask.

The situation

A receipt for a collection a year ago is missing.

What you do

  1. Chases the contractor while the relationship is live

What you get

The gap closes while it is easy.

The situation

The contractor sends the receipt months later.

What you do

  1. Requests and chases automatically

What you get

The document arrives without being hunted.

The situation

Nobody knows how much has been removed over the year.

What you do

  1. Checks the history by period

What you get

The figure comes from the archive rather than an estimate.

The situation

The contractor changes and the history goes with them.

What you do

  1. Keeps its own copy of every receipt

What you get

The change does not take the previous years.

This article answers

  • waste transfer documentation
  • waste chronological register
  • authorised waste manager documentation
  • company waste traceability