An installer working for several main contractors

The same documents, requested by five different clients, on five different portals, in five different formats.

Updated on 13/08/2026

If you are the company going on site, you live this every week: each main contractor has its portal, its checklist and its criteria, and they ask for the same thing under a different name. The temptation is to treat each client as a separate world. That is exactly what leaves an operative at the gate one morning.

What is shared and what belongs to each client

DocumentDoes it change by client?Where it should live
Company ones: insurance, social security, preventionNo, it is the same paperIn one place, copied out to each portal
Each worker'sNo, but requested per sitePer person, with their expiry dates
Equipment onesNo, requested per machinePer machine, with its serial number
The contractor's own formsYes, and there is no shortcut thereWith that site's file

Important

The expensive mistake is keeping documentation **by client instead of by item**. When the insurance renews, whoever files by client has to remember to update it in five places, and one always gets missed — usually the site you are entering next week. Filed by item, the insurance is one document, and what changes is which portals it goes to. The first is impossible to maintain; the second is half an hour a month.

How the real work is organised

  1. 1

    A company file, with expiry warnings

    It is the folder copied wholesale into each new portal.

  2. 2

    A file per worker and one per machine

    With training, medicals and inspections, each with its date.

  3. 3

    And a list per site of what that contractor asked for

    Because their next site will ask for the same.

  4. 4

    With the date each item was uploaded to each portal

    That is what settles the «we never received it» argument.

Watch out

What costs the most working days and nobody plans for: **each portal's validation takes time**. Even with everything uploaded correctly, someone on the other side has to approve it, and that can take days — not minutes. If the operative starts on Monday, the documents do not go up on Friday. And if one is rejected over a formatting detail, the clock restarts. That margin is the difference between getting on site and losing a crew's day.

When the criteria change halfway

Worth knowing

What documentation is required for site access, and what obligations each company has on prevention and coordination of activities, depend on the applicable rules and the type of works. **Your prevention service or adviser settles that**; the point here is not having five copies of the same paper ageing at different speeds.

Can I upload the same file to every portal?

Nearly always yes; what differs are their own forms.

What if a client asks for a document that does not exist?

Ask what they want to prove: something you already hold usually works.

Is it worth keeping what I uploaded?

Yes: half the arguments are about whether it was sent.

A real case

The situation

An installer renews its insurance and one contractor blocks access over the old policy.

What you do

  1. Keeps the insurance once, by item, and lists which portals need it

What you get

The renewal propagates in an afternoon instead of surfacing at the site gate.

The situation

An installer works for five contractors and uploads the same six documents to five different portals.

What you do

  1. Keeps a single current file of your own
  2. Uploads to each portal from there
  3. Records what was uploaded to each and when

What you get

Renewal happens once and gets replicated: five portals stop meaning five jobs.

The situation

An insurance policy is renewed and updated in only three portals.

What you do

  1. Checks which contractors it must be replicated to

What you get

None is left holding the old version.

The situation

A technician is stopped at a site gate.

What you do

  1. Checks per person before assigning them

What you get

The job does not go out with a gap.

The situation

Each contractor asks for the same document under another name.

What you do

  1. Keeps the original and adapts on upload

What you get

The underlying work happens once.

The situation

A portal rejects the document without saying why.

What you do

  1. Asks the specific reason before re-uploading

What you get

The second attempt is aimed.

The situation

Nobody knows what expires in which portal.

What you do

  1. Records expiries in your own file

What you get

One warning covers every portal.

The situation

Equipment goes on site and its documentation is missing.

What you do

  1. Stores it with the equipment

What you get

The machine does not sit at the bay.

This article answers

  • uploading documents to several contractor portals
  • asked for the same thing on every site
  • subcontractor documents for site access
  • refused site access over paperwork