Construction

The one who covers everyone else's work

You do the closing, so somebody else's defect gets buried with your signature on top. What you do not flag beforehand becomes yours.

Updated on 13/08/2026

Yours is the trade that closes: the lining, the suspended ceiling, the insulation, the floor. **You come in last over the work of three or four trades and, when you finish, nothing underneath can ever be seen again.** That casts you, without asking for it, as the last person who could have said something — and in claims that role weighs more than it looks.

What the closer inherits

What was underneathWho did itWho it is attributed to later
A correct installationAnother tradeNobody: there is no problem
A visible defectAnother trade**You, for covering it**
A non-visible defectAnother tradeIt gets investigated, expensively
**An uncommunicated change****Another trade****Whoever did not record it**

Important

**Closing over a visible defect without saying anything amounts, in practice, to owning it.** Not because a rule says so, but because you were the only one who could see it and did not speak, and that is exactly what gets asked afterwards. Breaking that chain costs two minutes: put on record what you found, dated, before covering it — and carry on working.

The procedure that protects this position

  1. 1

    Look before closing, even if it is not yours

    It is the only inspection that point will ever get.

  2. 2

    Record what is visible, without judging it

    A photo and a line. You do not have to say whether it is right or wrong.

  3. 3

    Notify whoever it concerns and leave the notice recorded

    The notice is what moves the decision to whoever should take it.

  4. 4

    And close when told to, with that stored

    The decision to close is rarely yours; the record is.

Watch out

The mistake in this position is **telling the foreman verbally and carrying on**. It is the natural thing: they are ten metres away, you tell them, they say they will handle it, you close. Months later nobody remembers that conversation, the foreman has left the company, and the only thing on record is that you closed it. A recorded notice does not delay you by a minute and turns «I did warn them» into something you can show.

Worth knowing

What checks fall to each trade before covering another's work, and how responsibility is shared when a defect surfaces later, **is determined by the contract and the supervising team, and settled by your adviser**. Here we cover the operational part: how to record what was found and the notice given, without slowing the works.

Can I refuse to close?

Your contract and the site supervision decide that. Putting it on record you can always do.

Is telling the foreman enough?

Verbally nothing remains. The same notice, recorded, does.

Is this not distrusting my colleagues?

It is recording what was seen. The alternative is answering for what others did.

A real case

The situation

Closing happens over another trade's defect and months later it is pinned on you.

What you do

  1. Records what was found before covering it

What you get

The other trade's defect has a date and a different author.

The situation

The notice is given verbally to the foreman and nothing remains.

What you do

  1. Records the notice with recipient and date

What you get

«I did warn them» becomes something you can show.

The situation

Nobody inspects a point before it disappears.

What you do

  1. Makes capturing easy at the workface without returning to the office

What you get

The last possible look leaves a trail.

The situation

The foreman who received the notice has left the company.

What you do

  1. Keeps the communication in the project file

What you get

The trail outlives the people.

The situation

Each trade keeps its own photos separately.

What you do

  1. Gathers the project's records in one place

What you get

The sequence of what happened can be reconstructed.

The situation

Justification for closing an area is requested two years later.

What you do

  1. Keeps dated records beyond the end of the project

What you get

The warranty period is faced with what was captured then.

This article answers

  • blamed for a defect that is not mine
  • what to check before closing up
  • putting on record what i find on site
  • liability for covering another trade's work