Construction
Subcontractors, sites and handover: document control where mistakes cost most.
Property development
- A development, from land purchase to handoverAdvancedTwo or three years, many actors, and documentation that outlives all of them.
- Handover documentation and warrantiesAdvancedWhat has to be handed over at the end, and why it is gathered during rather than after.
- The developer who doesn't buildAdvancedYou lay no bricks and you are the one answering to the buyer. Everything others do ends up in your file.
Residential building
Non-residential building
- Works in premises that stay openGoing furtherRefurbishing a shop, hotel or plant without closing: time-slot permits and people entering every night.
- The installer who arrives lastGoing furtherYou arrive with the job finished, in a hurry, and sign over work you never saw done. That is where the risk sits.
Refurbishment
Civil works
- Civil works and public tendersGoing furtherDocumentation reviewed by a public authority, on deadlines that are not negotiable.
- Residential building and handoverGoing furtherFrom the building file to the keys, with buyers who are not professionals.
- Installation and maintenance firmsGoing furtherMany small jobs, each with its own certificate and signature.
- Health and safety: what gets signed on siteGoing furtherMinutes, acknowledgements and equipment handovers: papers that only count if dated and signed by the right person.
- Keeping unqualified people off siteGoing furtherTie site access to paperwork, and let the system keep count.
- Public tenders: preparing the documentationAdvancedWhat repeats in every bid and what has to be redone each time.
- Several companies working at the same siteAdvancedWhen three companies share a site, the paperwork stops belonging to each of them and starts belonging to the place.
- The main contractor answering for others' workAdvancedYour name is on the contract and eight companies work on site. Whatever you fail to control is attributed to you anyway.
- Subcontractor document control on siteCollect each subcontractor's paperwork before they set foot on site, and let it expire on its own.