Getting started

How much time this really takes

The question nobody asks in the demo and the one that decides whether this sticks. The work does not vanish: it moves.

Updated on 13/08/2026

Demos show how quickly everything gets done, and that is true. What they do not show is that at some point someone has to sit down and decide what is requested, from whom and how often — and that stretch of time exists, however you dress it up.

Where the time goes, by phase

PhaseWhat it usually costsWho does it
Deciding what is asked and from whomA few hours, onceWhoever chases those documents today
Building the first processLess than you would thinkThe same person
Loading what you already haveDepends how much you bringIt can be shared out
The first month of running inA short stretch each dayWhoever owns it
From then onLess than before you startedThe team, without noticing

Important

The row that decides the outcome is the first, and it is the one everyone tries to skip: **thinking through what exactly is requested is the work, building it is the formality**. If those hours are not spent at the start, they are paid in months of corrections, badly framed requests and outsiders asking what you actually want. It is not implementation time: it is time spent ordering what you were already doing from memory.

What stops happening

Watch out

Something worth saying that the numbers do not show: **the saving does not appear where the work was**. Whoever was chasing stops chasing, but whoever builds the processes spends time up front, and they are not always the same person. If the one who gains time and the one who invests it differ, say so out loud at the start — otherwise the person carrying the initial load ends up feeling this only added work for them.

A realistic split for a small company

  1. 1

    One unhurried afternoon for the first process

    Better a whole afternoon than six twenty-minute slots.

  2. 2

    Fifteen minutes a day for the first two weeks

    Look at what arrives and fix what does not fit.

  3. 3

    Half an hour a month tidying up

    What is stalled, what has no owner, what is about to expire.

  4. 4

    And a longer review once a year

    Permissions, templates and whatever is no longer used.

Worth knowing

If nobody can spare that first afternoon, it is better to start with a smaller process than to start five half-built. What sinks a rollout is not going slowly: it is leaving three things half-set-up and nobody knowing which is live.

Do we need to hire someone?

In a small company, no. Someone needs to have the time.

What if nobody has time right now?

Start with what is already costing you hours: it pays for itself.

How long before it shows?

The first weeks cost; the change shows on the second cycle.

A real case

The situation

A company spreads the start across odd moments and three weeks in nobody knows what is set up.

What you do

  1. Devotes a whole afternoon to one process and leaves it running

What you get

The second process takes an hour, because the hard decisions were already made.

The situation

Effort is estimated from training rather than from designing the process.

What you do

  1. Counts the time spent deciding what is requested and from whom

What you get

The estimate includes the part that actually costs.

The situation

Nobody accounts for the time spent waiting on suppliers.

What you do

  1. Launches what depends on outsiders early

What you get

The wait is not added at the end of the schedule.

The situation

The rollout happens in odd moments between meetings.

What you do

  1. Blocks a whole afternoon for the first process

What you get

Decisions are taken once instead of picked up five times.

The situation

Maintenance is expected to be zero once it is set up.

What you do

  1. Reserves time monthly to review templates and expiries

What you get

The system is still true six months later.

The situation

Time spent is compared against zero rather than against the previous way.

What you do

  1. Measures how long closing a file used to take

What you get

The balance is struck against a real cost already being paid.

This article answers

  • how long does this take to implement
  • who is going to spend hours on it
  • we have nobody for this
  • how much work is it to maintain