Saltar al contenido

Use cases by sector

Industry: shop-floor and supplier control with evidence

Line checks with photo and time, risk-based supplier approval and closed non-conformities.

Open it in the platformUpdated on 13/08/2026

In a factory everything is checked and almost nothing can be proven. Reports are on paper, photos are on different phones, and supplier approval lives in a spreadsheet one person maintains. It works until the first customer complaint or the first second-party audit.

Approving by criticality. A supplier who can stop the line needs a different file from a consumables supplier.

Goods-in is where the money is saved

Catching a raw material problem at goods-in costs a return; catching it on the line costs a batch; catching it at the customer costs the complaint and the reputation. A goods-in check with evidence moves the finding to where it is cheapest.

Batch traceability

When a complaint lands, the question is always the same: which raw material went into that batch, what checks were done and who did them. If that is dated and evidenced, the answer takes hours. If it is on paper, it takes days and comes with doubts.

Watch out

Digitising a checklist by copying all forty points from paper is the classic mistake: if it takes twenty minutes, it gets filled in from memory at the end of the shift and does not work as evidence.

Frequently asked questions

Does it help with an IATF or ISO audit?

For the documentary side yes: dated evidence, supplier control and corrective action follow-up with closure.

Can it be used on the line, with gloves and no signal?

It runs from a phone. Without signal it is worth checking it uploaded before closing the shift.

Can I request different documents by supplier criticality?

Yes, one process per category. That is precisely what is recommended.

What about haulier documentation?

Same circuit: requested, expires, warns. It is one of the most commonly forgotten.

A real case

The situation

A customer complains about a batch and asks for full traceability in 48 hours.

What you do

  1. Filters by batch and pulls that shift's checks with their photos
  2. Attaches the certificates of the raw material that went in
  3. Adds the non-conformity raised and its action plan

What you get

A documented answer within the deadline, which is what stops the complaint escalating.

The situation

A client audit asks for evidence of plant control over the last six months.

What you do

  1. Checks the period's records with their dates
  2. Provides the log of real operations, not the procedure
  3. Records what was handed over

What you get

The control moves from assertion to evidence and the audit is prepared in an afternoon.

The situation

A client asks for the traceability of a specific batch.

What you do

  1. Checks that batch's file

What you get

You answer per batch rather than per catalogue.

The situation

A supplier certificate expires with material on the floor.

What you do

  1. Records expiries per supplier

What you get

The warning arrives before producing with it.

The situation

The trace breaks between production and despatch.

What you do

  1. Ties the batch produced to the outgoing delivery note

What you get

The batch is followed to the customer.

The situation

A problem must be contained and nobody knows what shipped.

What you do

  1. Checks which batches went to which customers

What you get

Those affected are warned rather than the whole base.

The situation

Each shift records differently.

What you do

  1. Uses the same form for everyone

What you get

The history is comparable.

The situation

Plant sheets are written up at the end of the day.

What you do

  1. Records at the moment

What you get

The data is exact rather than reconstructed.

This article answers

  • paperless shop-floor quality control
  • industrial supplier documentation
  • production batch traceability
  • factory non-conformity management
  • IATF ISO audit documentation