Site machinery: owned, hired and other people's

Three situations treated as one that are not: who keeps the paperwork and who answers for its use both change.

Updated on 13/08/2026

On a mid-sized site, machines from three different sources coexist, and documentation control is usually built for one of them: your own. The other two get improvised, and that is exactly where Monday morning's access problems come from.

The three situations and what changes

SourceWho holds the paperworkWho answers for its use
YoursYouYou
HiredThe hire firm issues it; you hold it while it is thereYou, while you use it
A subcontractor'sTheir companyThem, but you for letting it in
Hired with an operatorThe supplier, operator's certification includedIt is shared, and worth writing down

Important

The second row is the most neglected for one specific reason: **a hired machine's documentation leaves with the machine**. While it is on site you hold it, and the day it goes back it drops out of your reach — but the works carry on, and if in two years someone asks about a job done with it, you will have to show what applied then. A copy goes into the site file on arrival, not on return: by then nobody remembers.

What to check before it comes in

  1. 1

    That the machine's documentation is current

    Inspections, marking and whatever its type requires.

  2. 2

    That whoever operates it is certified for that machine

    Certified for one is not certified for all.

  3. 3

    The insurance covering it, and how far

    Especially on hire: it does not always include what you assume.

  4. 4

    And record the in and out dates

    It is what ties each job to the machine that did it.

Watch out

The case that generates most argument is hire with an operator: **one party supplies the machine and another directs the work**. If it is not written down who gives instructions and who answers for that operator's safety, the answer gets decided after the incident, which is the worst possible moment. Half a signed page at contracting settles what no machine documentation will ever clarify.

When the subcontractor's machinery arrives

Worth knowing

What documentation each type of machine requires, what certification the operator needs and how it is coordinated with the other companies is set by the applicable rules and your prevention service. **Check with them**; here it is about the copy being where it will later be needed.

Should I keep papers for a machine that was there two days?

Yes, with its dates: that is what ties it to those days' work.

Is the hire firm's documentation enough as is?

Yes, keeping a copy while it is there and noting the period.

What if the machine breaks and is swapped?

It is another machine: another number, another set of papers, another date.

A real case

The situation

A contractor returns hired plant and months later is asked for papers on a job it did.

What you do

  1. Files a copy in the site record on arrival, with dates

What you get

The job stays tied to the machine that did it, even though the machine is gone.

The situation

A hired machine arrives without its documentation.

What you do

  1. Requests it from the hire company before bringing it up

What you get

The machine does not sit idle at the bay.

The situation

Nobody knows which inspections are due on the owned machine.

What you do

  1. Records expiries per item of plant

What you get

The warning arrives before the date.

The situation

A subcontractor's machine goes on site unchecked.

What you do

  1. Checks the equipment documentation before authorising

What you get

What comes in has been checked.

The situation

The equipment documentation sits at the hire company's office.

What you do

  1. Keeps its own copy with the project file

What you get

It is shown on site without phoning anyone.

The situation

A review asks about a machine from months ago.

What you do

  1. Checks what was recorded on that date

What you get

You answer from the record.

This article answers

  • site machinery documentation
  • paperwork for hired plant
  • the subcontractor brings its own machinery
  • machinery access control